The single most important factor in any renewable project. It refers to the technical and contractual right to connect a project into the electricity network. In the UK, connections are granted either by a Distribution Network Operator (DNO) for local networks (typically <132kV) or National Grid ESO for the transmission system. Without a , no project can go ahead. For landowners, this means: don’t let an option agreement sit indefinitely if the developer has no confirmed connection rights.